Ceiling removal at the Sanctuary has started since Monday, 8 April 2024.
Operations will take place from Monday through Saturday until 22 April. On Saturdays, work ends at 4pm and resumes on Monday mornings over the 2-week period.
For your safety, please keep away from the Sanctuary when works are taking place.
Please also note that the Skip Tank is sited in front of the Sanctuary’s driveway. This is to ensure that unimpeded traffic flow on the main red brick road designated as Fire Engine Road Access.